This navigator stage consists of a number of sub steps designed to guide users through the process of setting up the standard reference HVAC systems.
It is important to have HVAC grouping schemes created before attempting the HVAC navigator steps. Users must create HVAC grouping scheme for both the Proposed & Standard Reference HVAC networks - refer to IECC 2012 for further guidance.
If this is the first time entering the IECC 2012 systems reference view users are presented with the IECC 2012 standard reference systems library. The ‘IECC 2012 Systems Guidance’ dialog helps the user select the correct system for their building configuration and via the linked documentation gives a full breakdown on configuring the default standard reference systems to match the specifics of their project.
The contents of Import and Edit Standard Reference System IECC