×
Menu
Index

4.15.3. Time dimension in simulation results and urban assessment

The evolution of a model over time is also reflected in the simulation results. It is thus possible to run, on the same model, different energy and water simulation for different years.
Before running an energy/water simulation, the year of the simulation can be chosen (see Chapter 5.4.3.2 Simulation year – Multiyear simulations). The simulation results are stored in the model for each specific year they have been performed on.
These results can then be visualised in reports and in the visualisation tool for each year as well.
The evolution of a model over time is also reflected in the site and urban planning assessment: evolution of the total Gross Floor Area, Building types, etc.
 
The online help was made with Dr.Explain