×
Menu
Index

TM54 requirements

The Monodraught HVR Navigator and datasets help create a compliance model suitable for assessing BB101 overheating. By necessity the BB101 methodology includes set daily occupancy times and occupancy during the summer period.
 
To assess the model for TM54 an operational model is required that more realistically reflects the design specific to the project.