The requirements laid down by the Section 6 Elemental and Heat Loss Methods, as applying to non-dwellings, can be set out as follows. The numbering system used here is that used in the <Virtual Environment> implementation. Paragraph numbers refer to the Technical Standards document[1].
Section 6 (non-dwellings) Elemental and Heat Loss Methods (including building services requirements)
JE 1. Fabric Requirement (paragraphs J8.2-J8.6 & J9-J14)
1. JE 1.1 Elemental Method (paragraphs J8.2-J8.4)
2. JE 1.1.1 U-value (Table J8.3) Requirement (paragraphs J8.3)
3. JE 1.1.2 Maximum Window/Door/Rooflight Area (Table J8.4) Requirement (paragraph J8.4)
4. JE 1.2 Heat Loss Method (paragraphs J8.5-J8.6)
5. JE 1.2.1 Overall Building Heat Loss Requirement (paragraphs J8.5)
6. JE 1.2.2 Maximum Traded-off U-value (Table J8.5) Requirement (paragraph J8.5)
7. JE 1.2.3 Average Traded-off U-value Requirement (paragraph J8.6b)
JE 2. Thermal Bridging and Air Infiltration Requirements (paragraphs J9.1 & J10.1)
JE 3. Heating Systems Requirements (paragraphs J11.1-J11.7)
8. JE 3.1 Heating Systems Carbon Intensity Requirement (paragraph J11.1)
9. JE 3.2 Heating Controls Requirements (paragraphs J11.2-J11.5)
10. JE 3.3 Insulation of Pipes, Ducts & Vessels Requirement (paragraphs J11.6-J11.7)
JE 4. Artificial Lighting Requirements (paragraphs J12.1-J12.3)
JE 5. Air-conditioning and Mechanical Ventilation (ACMV) Requirement (paragraph J13.1)
11. JE 5.1 Office CPI Method (paragraphs (J13.1) & Appendix K)
12. JE 5.1(MV) Office CPI Mechanical Ventilation Requirement (paragraph (J13.1) & App. K)
13. JE 5.1(AC) Office CPI Air-Conditioning Requirement (paragraphs (J13.1) & App K)
JE 6. Building Services Commissioning Requirement (paragraph J14.1)
The <Virtual Environment> implementation includes analysis of all these requirements and methods with the exception of:
Thermal Bridging and Air Infiltration Requirements (cannot be analysed in software)
Heating Controls Requirements (cannot be analysed in software)
Insulation of Pipes, Ducts & Vessels Requirements (cannot be analysed in software)
Building Services Commissioning Requirement (cannot be analysed in software)