CostPlan Cost Information
It is recommended that when naming files the filename should refer to the particular project and the extension to the type of data file. It is worth noting the following file naming conventions:
Deft geometry information from ModelIT
|
*.idl
|
Cost data file
|
*.cst
|
These files are described in more detail.
Deft Data File (*.idl)
This file contains a description of the model to be processed by CostPlan. It contains information regarding the 3D geometry of the model and the construction details for each surface.
ModelIT creates the *.idl file.
ModelIT is part of the ModelBuilder system.
Cost Data File (*.cst)
This file contains a list of the Cost categories, elements and parameters that are to be applied to generate the Outline Cost Plan.
The structure of the data is as follows:
Each Category is defined as follows:
Each Element is defined as follows:
-
-
Cost Data (0, 0, Unit cost, Code)
Cost Data File Templates
CostPlan can be customised to provide any cost plan. CostPlan uses information from the model and requires cost model data to help predict the capital cost of a building. IES provide two categories for cost plan:
· A whole building cost plan based upon the Royal Incorporation of Chartered Surveyors definition. This is called the QS model.
· A cost plan model for building services engineers. This is called the BS model.
Both of these models require cost data representative of particular classifications of buildings e.g. offices, hospitals, theatres, etc. IES have provided a number of templates for both the Quantity Surveyor and Building Services applications. There are purely indicative and should be used as the starting point of any analysis.
Royal Chartered Institute of Chartered Surveyors Cost Plan
The following cost models for the RICS cost plan are available:
Name
|
Description
|
quniversity.cst
|
Representative of university buildings
|
qoffice.cst
|
Representative of offices
|
qhospital.cst
|
Representative of hospital buildings
|
qschool.cst
|
Representative of schools
|
qtheatre.cst
|
Representative of theatres
|
qlibrary.cst
|
Representative of libraries
|
qfactory.cst
|
Representative of factory buildings
|
qothers.cst
|
Representative of building that do not fit into one of the aforementioned categories.
|
qarealt10k*.cst
|
All buildings with floor area less than 10,000m2
|
qareagt10kl25k*.cst
|
All buildings with floor area greater than 10,000m2 and less than 25,000m2.
|
qareagt25k*.cst
|
All buildings with floor area greater than 25,000m2.
|
qfloor1*.cst
|
All single floor buildings
|
qfloor1+*.cst
|
All buildings with more than one floor
|
This data has been extracted from the information published in the Architects Journal for different buildings. The cost information for each of the cost models is averaged for a number of examples and should not be viewed as accurate costing information.
The standard template for the RICS CostPlan takes the following form:
1. SUBSTRUCTURE
1A Substructure
2. SUPERSTRUCTURE
2A Frame
2B Upper Floors
2C Roof
2D Stairs
2E External Walls
2F Windows & External Doors
2G Internal Walls & Partitions
2H Internal Doors
3. INTERNAL FINISHES
3A Wall Finishes
3B Floor Finishes
3C Ceiling Finishes
3D Decorations
4. FITTINGS & FURNISHINGS
4A Fittings & Furnishings
5. SERVICES
5A Sanitary Appliances
5B Services Equipment
5C Disposal Installations
5D Water Installations
5E Heating
5F Ventilation
5G Air Conditioning
5H Electrical Installations
5I Gas Installations
5J Lifts & Conveyors
5K Protective Installations
5L Communications
5M Special Installations
5N B.W.I.C.
5O Profit & Attendance
6. EXTERNAL WORKS
6A Site Works
6B Drainage
6C External Services
6D Minor Building Works
An example print from a Cost Plan using this format is provided below:
Offices Total Floor Area = 2232.00m2
Section
|
Code
|
Rate (£)
|
Cost (£)
|
Cost/m2 (£)
|
1. SUBSTRUCTURE
|
|
1A
|
Substructure
|
11
|
71.51
|
159610.32
|
71.51
|
|
% Capital Cost = 6.60%
|
159610.32
|
71.51
|
|
2. SUPERSTRUCTURE
|
|
2A
|
Frame
|
11
|
63.05
|
140727.60
|
63.05
|
2B
|
Upper Floors
|
11
|
39.52
|
88208.64
|
39.52
|
2C
|
Roof
|
11
|
60.43
|
134879.76
|
60.43
|
2D
|
Stairs
|
11
|
19.91
|
44439.12
|
19.91
|
2E
|
External Walls
|
11
|
108.15
|
241390.80
|
108.15
|
2F
|
Windows & External Doors
|
11
|
77.29
|
172511.28
|
77.29
|
2G
|
Internal Walls & Partitions
|
11
|
47.53
|
106086.96
|
47.53
|
2H
|
Internal Doors
|
11
|
27.68
|
61781.76
|
27.68
|
|
% Capital Cost = 41.10%
|
990025.92
|
443.56
|
|
3. INTERNAL FINISHES
|
|
3A
|
Wall Finishes
|
11
|
34.92
|
77941.44
|
34.92
|
3B
|
Floor Finishes
|
11
|
41.12
|
91779.84
|
41.12
|
3C
|
Ceiling Finishes
|
11
|
23.06
|
51469.92
|
23.06
|
3D
|
Decorations
|
1
|
0.00
|
0.00
|
0
|
|
% Capital Cost = 9.20%
|
221191.20
|
99.10
|
|
4. FITTINGS & FURNISHINGS
|
|
4A
|
Fittings & Furnishings
|
11
|
30.62
|
68343.84
|
30.62
|
|
% Capital Cost = 2.80%
|
68343.84
|
30.62
|
|
5. SERVICES
|
|
5A
|
Sanitary Appliances
|
11
|
19.70
|
43970.40
|
19.7
|
5B
|
Service Equipment
|
11
|
41.46
|
92538.72
|
41.46
|
5C
|
Disposal Installations
|
11
|
7.57
|
16896.24
|
7.57
|
5D
|
Water Installation
|
11
|
6.54
|
14597.28
|
6.54
|
5E
|
Heating
|
11
|
103.75
|
231570.00
|
103.75
|
5H
|
Electrical services
|
11
|
100.58
|
224494.56
|
100.58
|
5J
|
Lifts & Conveyors
|
0
|
0.00
|
-
|
-
|
5K
|
Protective Installations
|
11
|
8.50
|
18972.00
|
8.5
|
5L
|
Communications
|
11
|
9.90
|
22096.80
|
9.9
|
5N
|
B.W.I.C.
|
11
|
17.74
|
39595.68
|
17.74
|
5F
|
Ventilation
|
0
|
0.00
|
-
|
-
|
5G
|
Air Conditioning
|
0
|
0.00
|
-
|
-
|
|
% Capital Cost = 29.30%
|
704731.68
|
315.74
|
|
6. EXTERNAL WORKS
|
|
6A
|
Site Works
|
1
|
0.00
|
0.00
|
0
|
6B
|
Drainage
|
1
|
0.00
|
0.00
|
0
|
6C
|
External Services
|
11
|
118.32
|
264090.24
|
118.32
|
6D
|
Minor Building Works
|
1
|
0.00
|
0.00
|
0
|
|
% Capital Cost = 11.00%
|
264090.24
|
118.32
|
|
|
TOTAL =
|
2407993.20
|
1078.85
|
Building Services Cost Plan
The building services cost models are, in theory, a subset of the QS cost model. The following cost models are available for the BS cost plan:
Name
|
Description
|
Boffice.cst
|
Representative of low rise, non-air conditioned offices
|
Bhospital.cst
|
Representative of hospital buildings
|
Bschool.cst
|
Representative of schools
|
Btheatre.cst
|
Representative of theatres
|
Bacoffice.cst
|
Representative of air conditioned modern multi-storey offices
|
Bmall.cst
|
Representative of shopping centres.
|
This data has been extracted from information published in the CIBSE journal for different buildings. The cost information for each of the cost models is averaged for a number of examples and should not be viewed as accurate costing information.
The standard template for the Building Services CostPlan takes the following form:
1. Mechanical Services
1A Boiler Plant
1B LTHW installation
1C Chilled Water Installation
1D Mechanical Ventilation/Air Conditioning
1E Toilet ventilation
1F Plant room ventilation
1G Building management system
1H Commissioning
1I Autoclave installation
1H Medical gas installation
2. Public Health installation
2A Cold water services
2B Condensate drains
2C Sanitary ware
2D Domestic Hot Water
2E Rainwater installation
2F Soil, waste and vent systems
3. Fire Protection
3A Dry riser
3B Hand-held appliances
3C Hose-reels
3D Sprinkler installation
4. Electrical Installation
4A Standby generator
4B Small power
4C LV installations
4D a. Lighting - Offices
4D b. Lighting - Circulation
4D c. Lighting - Toilets
4D d. Lighting - Reception
4D e. Lighting - Controls
4D Internal Lighting sub-total
4E External Lighting
4F Voice/data wire ways
4G Security installations
4H Fire alarm
4I Power supplies
4J Lightning protection
4K Earthing and bonding
4L Miscellaneous