Results analysis

Briefly to explore the performance of Roof terminals in the VE consider the following.
 
Select a target room:
VistaPro – room results
 
 
VistaPro – Roof terminal damper results
 
Select nothing:
VistaPro – Macroflo arrows results
 
The next two images, for the same timestep, show Roof terminal performance with wind from the south (from the left of the image) firstly with a roof terminal (with low level inlets) and secondly the same roof terminal but with an opening window on the room south wall.
 
In the first image you can see the wind driving the air down and into the room via the south windward roof terminal quadrant and being drawn out of the other three quadrants:
 
VistaPro – Roof terminal (with low level inlets)
 
In the second image you can see the wind driven flow into the room greatly reduced in the south windward roof terminal quadrant as wind driven flow comes through the room so driving pressure is reduced. The airflow through the room via the window increases flow out of the east and west roof terminal quadrants. In this state the roof terminal acts mostly as an exhaust unit.
 
VistaPro – Roof terminal with opening room window