9.3.3.1 Create/refresh baseline network
For the reference HVAC network, this creates a duplicate of the network in GMproposed.asp, and stores it in GMReference.asp.
Depending on model conditions, several alterations may be required for Green Mark compliance:
If the total floor area of air-conditioned spaces exceeds 5000 m2, a water-cooled chilled water system should be selected.
Chiller details (in particular, COP) should be verified against SS530.
Any changes that need to be made to the network can be done by opening it in the HVAC module using the next item in the navigator.