This tab on the dialog at the lower edge of the VE Compliance screen allows you to view the results of Scotland Section 6 (2022) calculations. The content of the tab changes between compliance and EPC mode.
Apachesim Compliance:
In some cases, where no direct fossil fuel is in use, there is no value required for TER. In this case the TER displays a dash. The pass or fail will not include TER in this case as the test logic in this case will only use TDER.
Apachesim EPC:
Building Emissions Rate (BER)
The Building Emissions Rate (kgCO2/m2) calculated for the actual building.
Notional Building Emissions Rate
The Building Emissions Rate (kgCO2/m2) calculated for the notional building (Cnotional).
Target Emissions Rate (TER)
The 2022 Target Emission Rate is the 2022 Notional building emission rate.
Building Delivered Energy Rate (BDER)
The Building Delivered Energy Rate (kWh/m2) calculated for the actual building.
Target Delivered Energy Rate (TDER)
The Target Delivered Energy Rate (kWh/m2).
Did the analysis pass the CO2 emissions rating?
‘PASS’ or ‘FAIL’
View Compliance Doc
Click on this button to view the Compliance Document generated by BRUKL using inputs from the actual and notional building simulations, together with the data entered in Building & System Data and the results of U-value checks and limiting Solar Gain check.
Calculation details
Click on this button to view the calculation data using inputs from the ApacheSim calculations, together with the data entered in Building & System Data and the results of U-value checks.