The Scotland Section 6 (2022) analysis and results dialog on the lower edge of the VE Compliance view is divided into two tabs:
·Section 6 (2022) - Scotland - Analysis: facilities for specifying the analysis to be performed.
·Results: facilities for viewing the results of the analysis
The content of the first of these tabs depends on the room selection.
When at least one room is selected it displays editable data for the NCM activities assigned to the selected rooms.
When no room is selected it provides access to the Building & System Data dialog, which displays data at building or system level required by the BRUKL compliance and EPC generation modules, together with thermal bridging data.
In either case the tab also displays options for running compliance or EPC analyses.
The Results tab displays the results of the compliance or EPC analysis.