The GM-Pro Navigator assists the user through the Green Mark®validation process. It aims to assist the user with automated steps and reminders throughout their project.
The general workflow centred around the navigator involves the following steps:
1.Model, configure, and analyse the Real Model (also sometimes referred to as the Actual model). This is the building as designed and as it will be constructed. All actions up to the Compliance models section is aimed at developing the Real Model.
2.When satisfied with the Real Model, the Compliance models section of the navigator assists with the construction of the Proposed and Reference model variants. The Proposed model is based on the real model, whereas the Reference (or Baseline) model is based on the same geometry, but is customised as per Green Mark baseline requirements.
3.The Simulation workflow steps will analyse and compare the Proposed and Reference models.
4.Part 0, Part 1 and the Appendices workflow sections assist with the credit data for the Proposed (and, where appropriate, Reference) models.