1.3.6 Part L2 analysis and results

The Part L analysis and results dialog on the lower edge of the VE Compliance view is divided into two parts:
 
·         Part L2 (2021) – England - Analysis: facilities for specifying the Part L2 analysis to be performed.  In the case of Part L2 (2022) Wales, this will be labelled ‘Part L2 (2022) - Wales – Analysis’.
·         Results: facilities for viewing the results of the analysis
 
Note: this tab will be labelled “Part L2 (2014) – Wales – Analysis” when in Wales 2014 mode.
The contents of the first of these tabs depends on the room selection.
When at least one room is selected it displays editable data for the NCM activities assigned to the selected rooms.
When no room is selected it provides access to the Building & System Data dialog, which displays data at building or system level required by the BRUKL compliance and EPC generation modules, together with settings for simulation-based analysis.
In either case the tab also displays options for running compliance or EPC analyses.