×
Menu
Index

Import and Edit Reference System NECB 2017

 
This Navigator stage consists of a number of sub steps designed to guide users through the process of setting up the reference HVAC systems.
 
It is important to have HVAC grouping schemes created before attempting the HVAC navigator steps. Users must create HVAC grouping scheme for both the Proposed & Reference HVAC networks - refer to NECB 2017 for further guidance.
 
If this is the first time entering the NECB systems reference view users are presented with the NECB reference systems library. The ‘NECB Systems Guidance’ dialog helps the user select the correct system for their building configuration and via the linked documentation gives a full breakdown on configuring the default reference systems to match the specifics of their project.