×
Menu
Index

1.3.3 Envelope

1.       Provide a comprehensive list of accurately described opaque materials
2.       Combine materials into constructions
3.       Describe fenestration performance properties (e.g., U-value, Solar Heat Gain Coefficient (SHGC), Visible Transmittance)
4.       Apply exterior insulated constructions to demising surfaces
5.       Check that proposed exterior constructions meet mandatory U-value requirements
6.       Remove user model building shades
7.       Retain user model geometry
8.       Adjust excess user model fenestration to standard design maximum window-to-wall ratio (WWR) and skylight-to-roof ratio (SRR) values.